• News
  • Reviews
  • Features
    • Articles and Long Reads
    • Interviews
    • Exclusives
  • Pop Culture
    • Movies
    • Television
    • Comic Books
    • Video Games
    • Toys & Collectibles
  • Flickering Myth Films
  • About
    • About Flickering Myth
    • Advertise on FlickeringMyth.com
    • Write for Flickering Myth

Flickering Myth

Film & TV News, Reviews and Features

  • Movies
  • News
  • Reviews
  • Long Reads
  • Trending
  • Franchises
    • Marvel
    • DC
    • Batman
    • Star Wars
    • Transformers
    • G.I. Joe
    • Masters of the Universe
    • Street Fighter
    • Teenage Mutant Ninja Turtles
    • Star Trek
    • The Lord of the Rings
    • James Bond
    • Alien
    • Predator
    • Doctor Who
    • Harry Potter

The Lone Ranger riding behind schedule and over budget?

June 14, 2012 by admin

Despite the fact that Disney has already halted production on their big screen adaptation of The Lone Ranger once last year amid budgetary concerns, it seems that director Gore Verbinski and producer Jerry Bruckheimer are yet to learn their lesson. According to The Hollywood Reporter, the budget for the Johnny Depp / Armie Hammer team-up has once again spiralled to $250m (it had previously been trimmed to $125m back in August to resolve the previous dispute), and the production is apparently “days or possibly weeks behind its 120-day shooting schedule” due to severe weather disruptions.

With the budget ballooning, the project is facing an additional set of rewrites to help keep costs down, with an ‘insider’ quoted as stating: “It’s out of control…but if you were going to bet on anyone, it would be on Gore, Johnny and Jerry.” The trio have of course made plenty of box-office bucks for Disney, with the original Pirates of the Caribbean trilogy banking close to $2.7 billion for the studio, while executives who have seen early footage from the film are said to believe that “Verbinski has a chance to do for Westerns what he did for pirate movies – make the genre popular internationally.”

Verbinski and Depp have previous experience in the Western genre with the Academy Award-winning CG-animated feature Rango, but despite its Oscar success, Rango earned just $245m from a budget of $135m, while Depp’s most recent Tim Burton collaboration, Dark Shadows, also failed to set the box-office on fire. Westerns meanwhile are a notoriously hard sell (Heaven’s Gate, anyone?), and although Disney are flush with cash off the back of Marvel’s The Avengers, there must surely be some concerns within the studio that they could have another John Carter on their hands when The Lone Ranger rides into cinemas on July 3rd, 2013.

Originally published June 14, 2012. Updated April 10, 2018.

Filed Under: Uncategorized

ADD US TO YOUR PREFERRED SOURCES

WATCH OUR LATEST VIDEO HERE

YOU MIGHT ALSO LIKE:

10 Essential Cult Classic 80s Movies You Need To See

10 Essential Workplace Movies

10 Essential Frankenstein-Inspired Movies You Need To See

6 Great Rutger Hauer Sci-Fi Films That Aren’t Blade Runner

Mission: Impossible III at 20 – The Story Behind the Underrated Action Sequel

Great Creepy Dog Horror Movies You Need To See

The Best ‘So Bad It’s Good’ Horror Movies

Basket Case vs. The Brood: Different Directors, Same Movie

10 Great Forgotten 90s Thrillers Worth Revisiting

10 Essential Action Movies from 2005

FEATURED POSTS:

2026 BFI London Film Festival Review – Ink

Slow Horses Season 6 Episode 5 Review – ‘Sayonara’

Movie Review – Sense and Sensibility (2026)

Marvel Legends Series Cyclops & Wolverine Astonishing X-Men 2-pack unveiled by Hasbro

2026 BFI London Film Festival Review – Ray Gunn

Video Review – Crystal Lake is the Stranger Things-ifcation of Friday The 13th

Movie Review – You Can See Everything (2026)

Essential Sorority Horror Movies of the 1980s

FLICKERING MYTH FILMS

   

YOU MIGHT ALSO LIKE:

The Top 10 The X-Files Episodes

Johnnie To, Hong Kong Cinema’s Modern Master

Great Cyberpunk Movies You Need To See

Is AI About to Make Creatives Irrelevant?

  • News
  • Reviews
  • Features
    • Articles and Long Reads
    • Interviews
    • Exclusives
  • Pop Culture
    • Movies
    • Television
    • Comic Books
    • Video Games
    • Toys & Collectibles
  • Flickering Myth Films
  • About
    • About Flickering Myth
    • Advertise on FlickeringMyth.com
    • Write for Flickering Myth

© Flickering Myth Limited. All rights reserved. The reproduction, modification, distribution, or republication of the content without permission is strictly prohibited. Movie titles, images, etc. are registered trademarks / copyright their respective rights holders. Read our Terms of Use and Privacy Policy. If you can read this, you don't need glasses.


 

Flickering MythLogo Header Menu
  • News
  • Reviews
  • Movies
  • Features and Long Reads
  • Trending
  • Franchises
    • Marvel
    • DC
    • Batman
    • Star Wars
    • Transformers
    • G.I. Joe
    • Masters of the Universe
    • Street Fighter
    • Teenage Mutant Ninja Turtles
    • Star Trek
    • The Lord of the Rings
    • James Bond
    • Alien
    • Predator
    • Doctor Who
    • Harry Potter
  • Flickering Myth Films
  • About Flickering Myth
    • About Flickering Myth
    • Advertise on Flickering Myth
    • Write for Flickering Myth